Announcement Sign:
Resently we lost the announcement sign in the front of the neighborhood. We are taking bids on replacing this with a sign that will match the neighborhood's monument sign. Insurance bids are in the process of being collected for funding and replacement. As a side benefit to the loss, we have recovered both sides of the old sign. This will allow us to create two, one sided announcement signs. Placement to be determined but both signs will cost under $300.00 to construct and place.
Walking Trails:
In a continuing effort to improve the ammenities of the Association, the nature trail is to be reopened this fall. 33 acers of walking trail, along with a nature reserve will be improved, and open to all. We are budgeting for the crushed granite, with the help of the Eagle Scouts (to be determined at a later date). Project projected for 2009.
Retention pond upgrades:
Currently reviewing creation of pathway for jogging and walking around the retention pond areas on Creek Willow. This could include digging the ditched deeper, and aeriation. The ditches will still function as the retention pond for that area, but will allow for residents to use the area to its fullest. Pathway is under consideration after expanding the ponds capacity.
Willow Creek access:
While doing the upgrades, clearing, and cleaning of the nature trail, we will create cut thru areas for creek access so residents can fish, and enjoy an otherwise underutilized resource, that has been hidden all these years.
This will be a zero cost as we clear the 3.2 acers donated by Dowdell PUD
Creekside Place Merger:
Currently in talks to merge with creekside place. Since they are in debt from developer, we are observing their performance and will guage the merger from that aspect. At this time, all projects with Willow Forest are funded without regard to the merger.